After the recent post on gas boilers, Alan Clarke gave the following pointers relevant to our ultra low energy refurb...
With a small radiator system it isn't critical to have an ultra small boiler, but roughly speaking the capacity of the radiators ought to match the minimum boiler output - though this will be higher than your heat loss (smallest system boiler is 3kW min I think).
If you'll be having a combi, these have to be reasonably powered to heat water quickly enough for a shower - and hence have a higher minimum output too at 6-7kW - so will need more radiator capacity.
Then I think it is important to have good controls to control the radiator temperature, to derate the output to suit the low heat load of your house.
I like the rehema avanta boilers for dealing with low heating loads this way, these have either a simple room-compensating controller, or a fancy programmable thermostat, which also offers weather compensation. But having used one of these with a local builder in a passivhaus he's asked to use Worcester Bosch for the next job as they are easier to deal with for spares and servicing - and Worcester Bosch now also do boilers with "intelligent controls".
In the event we have gone for an Atag - but it may be some time before know whether this was a good choice or not. Hopefully we'll have moved back in and be using it for hot water in the autumn, and won't need to heat any radiators until November / December....
Sunday, 8 July 2012
Sunday, 1 July 2012
Air tightness
Just getting to start the external wall insulation took some effort - making sure holes, vents etc in the wall were blocked up (or in some cases filled with foam), and making sure key areas were reasonably air tight with blue felt and blue tape.
The main air tightness barrier will be on the inside - the plaster on the brick walls, and a breathable membrane in the attic room.
However, we want to achieve a pretty good level of air tightness on the outside so that air doesn't get into the insulation layer from the outside and "wick" heat away from the house.
The main air tightness barrier will be on the inside - the plaster on the brick walls, and a breathable membrane in the attic room.
However, we want to achieve a pretty good level of air tightness on the outside so that air doesn't get into the insulation layer from the outside and "wick" heat away from the house.
Saturday, 23 June 2012
It's all go!
It's been a busy couple of weeks. All of a sudden, there's a lot going on.
First the PV panels appeared (but are not connected up yet). It will be interesting to see how much energy we generate and how much we use during the course of a year. The house will use more energy overall (gas + electric) than the electricity that these PVs can generate, but we are aiming to make that difference as small as possible.
Next came the insulation of the external walls, which is still in progress.
First the PV panels appeared (but are not connected up yet). It will be interesting to see how much energy we generate and how much we use during the course of a year. The house will use more energy overall (gas + electric) than the electricity that these PVs can generate, but we are aiming to make that difference as small as possible.
Next came the insulation of the external walls, which is still in progress.
Thursday, 7 June 2012
Ground floor to wall junction
We have just spent a very festive Jubilee weekend crawling around on a concrete floor in a quest to achieve air tightness and insulation at the floor-wall junction.
First, our willing helpers did a spot of cleaning (tapes don't stick well to gravel, grit and dust). Rather a lot of cleaning was required.
Then we sealed up as many holes in the brickwork as possible with off-cuts of EPS or a squirt of expanding foam.
The green stuff (Pro Clima DA-S) is supposed to prevent air from finding its way up the walls from below floor level (although it won't be able to do that until the walls are plastered or rendered).
And finally, the insulation up-stands which will reduce heat loss from screed to walls. All we need now is the screed...
Will it work? We should be able to answer that question once the walls are plastered and an air tightness test is carried out.
With hindsight, easier ways to achieve this spring to mind - probably using smaller quantities of materials and saving time and money.
First, our willing helpers did a spot of cleaning (tapes don't stick well to gravel, grit and dust). Rather a lot of cleaning was required.
Then we sealed up as many holes in the brickwork as possible with off-cuts of EPS or a squirt of expanding foam.
The green stuff (Pro Clima DA-S) is supposed to prevent air from finding its way up the walls from below floor level (although it won't be able to do that until the walls are plastered or rendered).
And finally, the insulation up-stands which will reduce heat loss from screed to walls. All we need now is the screed...
Will it work? We should be able to answer that question once the walls are plastered and an air tightness test is carried out.
With hindsight, easier ways to achieve this spring to mind - probably using smaller quantities of materials and saving time and money.
Tuesday, 29 May 2012
Door thresholds
In a house that has been well insulated externally, the opportunities for heat loss from the house are greatly reduced. Most of the heat loss that does occur is concentrated around the weakest points, such as those locations where a non-insulating part of the structure passes through the insulation or is poorly insulated.
One tricky area where cold bridging is difficult to minimise is the door threshold. No matter how good the door (these are passive house suitable triple glazed doors called 'EcoPassiv'), the positioning of the door and the cold bridge detailing is still critical.
We have done our best with the back door by placing it in a ply box which protrudes beyond the brickwork and into the insulation. However, it is important that the flow screed does not come into direct contact with the brick walls which are exposed at the door opening.
We have done our best with the back door by placing it in a ply box which protrudes beyond the brickwork and into the insulation. However, it is important that the flow screed does not come into direct contact with the brick walls which are exposed at the door opening.
In this case, we removed a course of bricks and placed highly insulating Marmox thermoblocks on top instead. (These will be covered when the flow screed is poured).
The photo shows 4 grey Marmox blocks which sit directly on top of the brickwork. These will reduce heat loss from the screed into the brickwork below. On either side of the Marmox blocks, silver EPS and white external insulation can be seen. Below the slab in the foreground is a 300mm thickness of silver EPS.
Elsewhere, around the edge of every room, up-stands of insulation will form a barrier preventing heat in the screed from transferring horizontally into the brick walls and from there into the ground.
Tuesday, 22 May 2012
Which gas boiler?
On the long list of decisions to make is the choice of gas boiler.
Given that hot water use will probably be higher than our heating requirements (and we are low water users to boot), we'll want a boiler that is very, very small. I'm hoping we'll be using less than 5000 kWh per year of gas in total.
A top of the price range, super-efficient boiler won't save us much, given how little gas we will use. A small and basic combi boiler at a correspondingly basic price sounds attractive right now!
Any suggestions?
Given that hot water use will probably be higher than our heating requirements (and we are low water users to boot), we'll want a boiler that is very, very small. I'm hoping we'll be using less than 5000 kWh per year of gas in total.
A top of the price range, super-efficient boiler won't save us much, given how little gas we will use. A small and basic combi boiler at a correspondingly basic price sounds attractive right now!
Any suggestions?
Air tightness and insulation coming soon
The long gap since the post about insulation below the damp proof course does not indicate a lack of activity - just my lack of interest in groundworks.
Once the groundworks are complete (and essential things like gas, electricity and water which for various reasons are being moved into the garage) we are on to the main external wall insulation and lots of air tightness work - hurray. June will be busy!
One thing to consider if embarking on a refurbishment project is that there are chickens and eggs all over the place, making life complicated and slowing things down.
For example, if the gas meter is on the external wall and you don't want to create a major thermal bridge by only insulating round it, you have to move it. But if you want to put it on the external house wall, that has to be insulated before re-instating the gas meter. So what to do in the meantime? Live without gas? Pay to disconnect and then reinstate, which costs more?
In our case, we decided to move the gas meter to the garage wall. Which would have been very simple if the garage had been in a fit state, but with the whole structure sinking badly, we decided to rebuild. Only now is the new garage wall in place to receive the gas meter. The rest of the garage can't be built until the external wall insulation is complete. So installation of the gas boiler and MVHR unit will have to wait until we have a garage roof. And so it goes on.
Once the groundworks are complete (and essential things like gas, electricity and water which for various reasons are being moved into the garage) we are on to the main external wall insulation and lots of air tightness work - hurray. June will be busy!
One thing to consider if embarking on a refurbishment project is that there are chickens and eggs all over the place, making life complicated and slowing things down.
For example, if the gas meter is on the external wall and you don't want to create a major thermal bridge by only insulating round it, you have to move it. But if you want to put it on the external house wall, that has to be insulated before re-instating the gas meter. So what to do in the meantime? Live without gas? Pay to disconnect and then reinstate, which costs more?
In our case, we decided to move the gas meter to the garage wall. Which would have been very simple if the garage had been in a fit state, but with the whole structure sinking badly, we decided to rebuild. Only now is the new garage wall in place to receive the gas meter. The rest of the garage can't be built until the external wall insulation is complete. So installation of the gas boiler and MVHR unit will have to wait until we have a garage roof. And so it goes on.